Apr 27, 2017
Flat terrain, prepared surface--the K&P Canada 150 Bike Ride taking place on May 6th (10 to noon) will be a comfortable ride over historic ground. This family-friendly Bike Ride takes place on the former rail bed abandoned by the Canadian Pacific Railway. Starting from Tichborne, cyclists will travel 10 km each (for a total of 150 km) passing through bush, swamps and over bridges.
The Kingston-Pembroke Railway (known locally as “The Kick and Push”) once connected a string of small villages that depended on it for commerce as well as for their household goods. The Conboy’s shipped their maple syrup on the railway; Eatons delivered dressers and tables; cattle, fattened on the local farms, ended up in Toronto stockyards .
Formed in 1998, the K&P Trail Group promotes the K&P as a right of way with a free multi-use trail starting at Sydenham Road. No motorized vehicles are allowed. In November 2015, the County of Frontenac, which owns its portion of the trail, completed the section from Harrowsmith to Tichborne. The new section is approximately 20 kilometers long and includes bridges over White Creek, Elbow Creek and Fish Creek. The next phase aims to bring the trail to Sharbot Lake and is expected to be completed in 2018. The K&P Canada 150 Bike Ride is hosted by the SteeleBender Cycle Club and is sponsored by the Railway Heritage Society. Further information at 613 279-2144.
More Stories
- Joint the 450 Challenge - Blood Drive in Sharbot Lake
- Lions Club of Land O'Lakes Roar
- Frontenac Heritage Festival Recovers From A Near Death Experience
- Changes to Safe Properties Bylaw Spark a Major Reaction from CF Residents
- Robert Hogan Bus Lines Give Back
- Frontenac County to Require ATV Riders to Pay for Trail Use
- Snow Social in Sydenham
- Lessons From the Past
- Chicken Bylaw Becoming a Reality in Addington Highlands
- Central Frontenac Says No More Pickleball in Piccadilly Hall